24-hour TSP Monitoring Results                                
                                     
Station CM_AB1a, The Hong Kong Ice and Cold Storage (Aberdeen)                      
Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
04-Jan-11 08:00 05-Jan-11 08:00 Fine 2.7795 3.0214 1958.80 1982.80 24.00 1.2159 1.2159 1.2159 138 174.2 260 Grouting works Ice Factory 431
10-Jan-11 08:00 11-Jan-11 08:00 Fine 2.8643 3.153 1982.80 2006.80 24.00 1.2153 1.2153 1.2153 165 174.2 260 Grouting works Ice Factory 438
14-Jan-11 08:00 15-Jan-11 08:00 Fine 2.8967 3.1608 1982.80 2006.80 24.00 1.2090 1.2090 1.2090 152 174.2 260 Grouting works Ice Factory 445
20-Jan-11 08:00 21-Jan-11 08:00 Fine 2.8436 3.1415 2030.82 2054.82 24.00 1.2567 1.2567 1.2567 165 174.2 260 Grouting works Ice Factory 451
26-Jan-11 08:00 27-Jan-11 08:00 Fine 2.8127 2.9966 2054.82 2078.82 24.00 1.2619 1.2619 1.2619 101 174.2 260 Soil excavation Ice Factory 457
                        Min. 101          
                        Max. 165          
                      Average 144